Project: US Bank Scope: Remove approximately 78,000 SF of wall and ceiling plaster, black coating, millboard, fireproofing, and VAT/mastic. Additional 6,000 LF of pipe insulation and tape. Description: US Bank building in the heart of downtown Portland was built in 1920 and since then the building has been listed on the U.S. National Register [...]
Sovereign Hotel
twirl2020-03-24T04:04:19-07:00Project: Sovereign Hotel Scope: Removal of 1500 SF wall texture, tile and mastic, and 300 LF of pipe insulation. Description: Being one of Portland’s first skyscraper built in 1920, the Sovereign Hotel is 9 stories high and was majorly renovated during this renovation we approximately removed 1,500 SF of wall texture, tile, and mastic [...]
RedFox Commons
twirl2020-03-24T05:14:22-07:00Project: Red Fox Commons Project Location: 2638 NW Wilson St, Portland OR 97210 Scope: Removal of 9,300 SF of tile/mastic and joint compound Description: The RedFox Commons was a large project that consisted of removing approximately 9,300 SF of tile/ mastic along with joint compound throughout what looked like a large warehouse at the [...]
Henry Building
twirl2020-03-24T04:04:19-07:00Project: Henry Building Scope: Selective demolition of all flooring levels 2-6, all kitchens, all ceilings, interior walls throughout, plumbing fixtures, HVAC duct work. Description: This historic building that was built in 1909 in downtown Portland, since then it has been remodeled and modified to keep it on its feet. During one of the modifications [...]
Madison High School
twirl2020-03-29T17:33:58-07:00Project: Madison High School Scope: 30,000 SF roof abatement, 54,000 SF flooring abatement, pipe insulation abatement throughout, 9,000 SF concrete slab demo. Description: Madison High School was one of the three schools that got approved to be remodeled and rebuilt through a bond in 2017. During the rebuilt and remodel we did a large [...]
Highland Elementary
twirl2020-03-24T04:04:18-07:00Project: Highland Elementary Scope: Remove 19,600 SF of asbestos containing roofing and wood shingles. Description: Highland Elementary we removed approximately 19,600 SF of asbestos in roofing, and wood shingles.
University of Oregon – Pacific Hall
twirl2020-03-24T04:04:18-07:00Project: University of Oregon – Pacific Hall Project Location: 1025 University St., Eugene, OR 97403 Scope: Removal of 8,000 SF of tile/mastic/roofing also removal of 7,200 LF of TSI pipe insulation Description: Over the last few years we have worked together with the University of Oregon helping them improve their building for the students [...]
Klamath Hall 3rd Floor
twirl2020-03-24T04:04:18-07:00Project: Klamath Hall 3rd Floor Scope: 2134 SF/LF of pipe insulation, hard fittings, valve packing, mastic, CAB, and selective demo of ductwork Description: In 1967 the building was originally opened and called Science II, in 1990 the building was renamed Klamath Hall after the Klamath people.
Multnomah County Courthouse
twirl2020-03-24T04:04:17-07:00Project: Multnomah County Courthouse GC: Hoffman Construction Scope: Removal, clean up and disposal of all walls, ceiling tiles, ceiling grids, and all associated materials throughout the building including mechanical ducts, equipment, piping, controls, and associated elements and light fixtures. Description: Our team worked very hard in the Multnomah County Courthouse, they removed, cleaned up [...]
Mt. Scott Community
twirl2020-03-24T04:04:17-07:00Project: Mt. Scott Community Scope: Center room concrete 4x4 area and closet/pantry 4x6 area, 1 window, Closet door area of 6x6, 3 different floors Description: Mt. Scott Community Center had a very short renovation. Our team removed windows, a couple doors, closet area and a section of concrete.