Project: Klamath Hall 3rd Floor
Scope: 2134 SF/LF of pipe insulation, hard fittings, valve packing, mastic, CAB, and selective demo of ductwork
Description: In 1967 the building was originally opened and called Science II, in 1990 the building was renamed Klamath Hall after the Klamath people.